Turbine Cockpit — V4Jaisalmer Wind Park

WTG-002

MAINTENANCE

Vestas V150-4.2MW · 4.2 MW rated · Jaisalmer Wind Park · commissioned 2021 · warranty 2063d remaining

Active Power
0.00 MW
Expected Power
0.00 MW
Wind Speed
13.3 m/s
Availability
63%
Data Age
0m (live demo)
Health Score
73
No open critical alarmsMode: Remote / AutoHealth score is 73derived from 3 tracked component(s), worst: Pitch System.
Interactive Schematic
24h Synchronized Power & Windactive / expected / potential / setpoint · state ribbon · alarm markers
kW (normalized)
06:30 pm06:15 pm
ActiveExpectedPotential
drag to zoom · double-click to reset · hover for values
Subsystem Health
DrivetrainOK
ElectricalOK
Pitch SystemLOW
Yaw SystemLOW
GearboxLOW
GeneratorOK
Peer Comparison (V150-4.2MW)
Availability vs peers63% vs 95.1%
SOH vs peers99.2% vs 96.2%
33 peer turbines of the same model in fleet
Open Work
Open cases0
Open work orders0
AI
Diagnostic summary — last 24h

No alarm-linked events in the displayed window. Availability is running below the V150-4.2MW peer average (63% vs 95.1%).