Portfolio Operations
Window: 24H · Live
Fleet-level KPIs across 6 sites · 48 turbines
Current Output
93.06 MW
Available
205 MW
Nameplate
219.2 MW
Today
771.5 MWh
Avg Availability
94.6%
Active Critical
1
Fleet Status
RUNNING41 · 85%
CURTAILED2 · 4%
STOPPED1 · 2%
MAINTENANCE3 · 6%
FAULTED1 · 2%
COMM LOSS0 · 0%
Top Issues
Ranked by production risk
| Turbine | Code | Severity | Lost MWh | Raised |
|---|---|---|---|---|
| WTG-009 | GENERATOR-BEARING-VIB | CRITICAL | 212.25 | 2d ago |
Sites
| Site | Capacity | Output | Availability | Lost MWh (30d) | Critical |
|---|---|---|---|---|---|
| Jaisalmer Wind Park | 42 MW | 18.9 MW | 95.65% | 307.9 | 1 |
| Kutch Wind Corridor | 33.6 MW | 12.8 MW | 98.59% | 273.6 | 0 |
| Tirunelveli Ridge | 37.8 MW | 12.2 MW | 97.41% | 100.2 | 0 |
| Chitradurga Plateau | 29.4 MW | 18.2 MW | 97.41% | 281.9 | 0 |
| Satara Ghats | 30 MW | 5.3 MW | 96.81% | 166.1 | 0 |
| Anantapur Flats | 46.4 MW | 25.6 MW | 99.15% | 289.2 | 0 |
24H Generation vs Expected
Expected Actual
AI
Shift brief
Fleet is producing 93.06 MW against 205 MW available (45%). 1 unresolved critical event(s) need attention, concentrated around WTG-009. Estimated 212.3 MWh currently at risk from active faults. See AI Copilot for a full drilldown.