Availability Statistics

Trailing 30 days · fleet avg technical availability 97.50% · 1419 MWh lost

By Site

SiteTechnical AvailabilityContractual AvailabilityLost MWh (30d)Top Loss Category
Jaisalmer Wind Park
95.65%
96.84%307.9Unplanned - Converter
Kutch Wind Corridor
98.59%
98.84%273.6Comms Loss
Tirunelveli Ridge
97.41%
99.31%100.2Scheduled Maintenance
Chitradurga Plateau
97.41%
97.54%281.9Comms Loss
Satara Ghats
96.81%
96.57%166.1Grid Curtailment
Anantapur Flats
99.15%
98.66%289.2Comms Loss
Per the PRD's data-quality rules: allocations shown here roll up from the governed site/turbine state model, and comms loss is not classified as downtime until the availability rule determines status. This prototype approximates that with pre-computed synthetic figures — Availability Allocations (Screen 08, not yet built) would be where those classifications are actually edited.