Turbine Cockpit — V4← Jaisalmer Wind Park
WTG-006
RUNNINGOEM: NORMAL_OPERATIONVestas V150-4.2MW · 4.2 MW rated · Jaisalmer Wind Park · commissioned 2024 · warranty 2063d remaining
Active Power
3.99 MW
Expected Power
4.11 MW
Wind Speed
16.1 m/s
Availability
96.9%
Data Age
0m (live demo)
Health Score
28
No open critical alarmsMode: Remote / AutoHealth score is 28 — derived from 2 tracked component(s), worst: Transformer.
Interactive Schematic
24h Synchronized Power & Windactive / expected / potential / setpoint · state ribbon · alarm markers
kW (normalized)
ActiveExpectedPotential
drag to zoom · double-click to reset · hover for values
Subsystem Health
DrivetrainOK
ElectricalOK
Pitch SystemOK
Yaw SystemOK
GearboxMEDIUM
GeneratorOK
Peer Comparison (V150-4.2MW)
Availability vs peers96.9% vs 94.1%
SOH vs peers96.4% vs 96.3%
33 peer turbines of the same model in fleet
Open Work
Open cases0
Open work orders1
AI
Diagnostic summary — last 24h
No alarm-linked events in the displayed window. Availability is running at or above the V150-4.2MW peer average (96.9% vs 94.1%).