Turbine Cockpit — V4Kutch Wind Corridor

WTG-014

RUNNINGOEM: NORMAL_OPERATION

Vestas V150-4.2MW · 4.2 MW rated · Kutch Wind Corridor · commissioned 2021 · warranty 2704d remaining

Active Power
0.45 MW
Expected Power
0.46 MW
Wind Speed
6.7 m/s
Availability
96.3%
Data Age
0m (live demo)
Health Score
13
No open critical alarmsMode: Remote / AutoHealth score is 13derived from 1 tracked component(s), worst: Pitch System.
Interactive Schematic
24h Synchronized Power & Windactive / expected / potential / setpoint · state ribbon · alarm markers
kW (normalized)
06:30 pm06:15 pm
ActiveExpectedPotential
drag to zoom · double-click to reset · hover for values
Subsystem Health
DrivetrainOK
ElectricalOK
Pitch SystemHIGH
Yaw SystemOK
GearboxOK
GeneratorOK
Peer Comparison (V150-4.2MW)
Availability vs peers96.3% vs 94.1%
SOH vs peers97.3% vs 96.2%
33 peer turbines of the same model in fleet
Open Work
Open cases0
Open work orders1
AI
Diagnostic summary — last 24h

No alarm-linked events in the displayed window. Availability is running at or above the V150-4.2MW peer average (96.3% vs 94.1%).