Turbine Cockpit — V4Kutch Wind Corridor

WTG-015

RUNNINGOEM: NORMAL_OPERATION

Vestas V150-4.2MW · 4.2 MW rated · Kutch Wind Corridor · commissioned 2024 · warranty 2704d remaining

Active Power
1.35 MW
Expected Power
1.39 MW
Wind Speed
8.6 m/s
Availability
96.6%
Data Age
0m (live demo)
Health Score
26
No open critical alarmsMode: Remote / AutoHealth score is 26derived from 3 tracked component(s), worst: Generator.
Interactive Schematic
24h Synchronized Power & Windactive / expected / potential / setpoint · state ribbon · alarm markers
kW (normalized)
06:30 pm06:15 pm
ActiveExpectedPotential
drag to zoom · double-click to reset · hover for values
Subsystem Health
DrivetrainOK
ElectricalOK
Pitch SystemOK
Yaw SystemMEDIUM
GearboxOK
GeneratorHIGH
Peer Comparison (V150-4.2MW)
Availability vs peers96.6% vs 94.1%
SOH vs peers98.2% vs 96.2%
33 peer turbines of the same model in fleet
AI
Diagnostic summary — last 24h

Most significant change: YAW-MISALIGN (WARNING), overlaid on the power chart above. Availability is running at or above the V150-4.2MW peer average (96.6% vs 94.1%).