Turbine Cockpit — V4← Chitradurga Plateau
WTG-028
RUNNINGOEM: NORMAL_OPERATIONVestas V150-4.2MW · 4.2 MW rated · Chitradurga Plateau · commissioned 2023 · warranty 225d remaining
Active Power
4.11 MW
Expected Power
4.23 MW
Wind Speed
13.6 m/s
Availability
99.4%
Data Age
n/a
Health Score
98
No open critical alarmsMode: Remote / AutoHealth score is 98 — derived from availability and SOH (no component-health records for this turbine).
Interactive Schematic
No high-resolution series for this turbine — see the note in Live SCADA.
Subsystem Health
DrivetrainOK
ElectricalOK
Pitch SystemOK
Yaw SystemOK
GearboxOK
GeneratorOK
Peer Comparison (V150-4.2MW)
Availability vs peers99.4% vs 94.0%
SOH vs peers97.5% vs 96.2%
33 peer turbines of the same model in fleet
Open Work
Open cases0
Open work orders0
AI
Diagnostic summary — last 24h
No alarm-linked events in the displayed window. Availability is running at or above the V150-4.2MW peer average (99.4% vs 94.0%).