Turbine Cockpit — V4← Chitradurga Plateau
WTG-030
RUNNINGOEM: NORMAL_OPERATIONVestas V150-4.2MW · 4.2 MW rated · Chitradurga Plateau · commissioned 2023 · warranty 225d remaining
Active Power
0.00 MW
Expected Power
0.00 MW
Wind Speed
3.4 m/s
Availability
97.5%
Data Age
n/a
Health Score
61
No open critical alarmsMode: Remote / AutoHealth score is 61 — derived from 4 tracked component(s), worst: Main Bearing.
Interactive Schematic
No high-resolution series for this turbine — see the note in Live SCADA.
Subsystem Health
DrivetrainOK
ElectricalOK
Pitch SystemLOW
Yaw SystemOK
GearboxOK
GeneratorLOW
Peer Comparison (V150-4.2MW)
Availability vs peers97.5% vs 94.0%
SOH vs peers95.1% vs 96.3%
33 peer turbines of the same model in fleet
Open Work
Open cases0
Open work orders0
AI
Diagnostic summary — last 24h
No alarm-linked events in the displayed window. Availability is running at or above the V150-4.2MW peer average (97.5% vs 94.0%).